01 The legal landscape

A preferred-bidder announcement is not a licensed plant.

Companies building small modular reactors hire project general counsel, NRC or ONR licensing counsel and offtake counsel. The scarce skill is a multi-year licensing clock joined to construction and nuclear-damage risk, not a renewables PPA with the word nuclear in the footnote. We recruit those seats for developers, utilities and PE-backed suppliers.

US licensing clock
Observed construction permits: 27 months (Kairos Hermes) and 22 months (TerraPower Kemmerer). Policy ceiling: 18 months from May 2025.
UK programme
Rolls-Royce SMR named preferred bidder 10 June 2025 with more than GBP 2.5bn pledged (GOV.UK). A preferred-bidder announcement is not a licensed reactor.
Design stock
Dozens of SMR designs under study worldwide. Designs are not licensed plants.
Sartori clock
GC/CLO shortlist 24 days, offer 11 weeks median (n=38, 2017–2026). PE-backed GC: 26 days / 12 weeks.
Guarantee
12 months on retained GC, CLO and CCO searches. Off-limits: 24 months on the client's legal department.

Nuclear is absent from the energy hub's older sub-sector list for a reason: until the last two years the in-house demand was a utility relic. The UK preferred-bidder pledge, the Kemmerer construction permit and the NRC 18-month ceiling changed the requisition, not the physics. Companies that staff this as renewables lose six months. Companies that staff it as power and utilities without a docket history lose the construction claim.

We have completed 230+ in-house placements since 2017 across 23 countries and 41 cities. Repeat clients or referrals account for 68% of corporate mandates. The company path is for companies; the PE-backed variant is PE portfolio legal recruiting.

02 Cited figures

The clocks a scorecard should name.

18 months
Ceiling set in May 2025 on an NRC decision for new construction or operation (one year for continued operation). The two construction permits in the public record took 27 months (Kairos Hermes) and 22 months (TerraPower Kemmerer). The gap between the ceiling and the observed clock is the in-house job.
U.S. Executive Order on nuclear reactor licensing, May 2025; U.S. NRC; U.S. Department of Energy (2026)
GBP 2.5bn
Pledged when Rolls-Royce SMR was named preferred bidder on 10 June 2025. A preferred-bidder announcement is a procurement file, not a licensed reactor.
GOV.UK, Rolls-Royce SMR selected to build small modular nuclear reactors (10 June 2025)
Designs, not plants
National regulators and the World Nuclear Association track dozens of SMR designs under study. Designs are not licensed plants; the lawyer is hired against the licensing and offtake file, not the brochure.
ASNR (France); World Nuclear Association
Public licensing clocks versus the policy ceiling. Read 10 September 2026.
DocketObserved clockWhat it is
Kairos Power Hermes27 months (accepted Sept 2021, permit Dec 2023)NRC construction permit
TerraPower Kemmerer Unit 122 months (2024–2026)NRC construction permit
Policy ceiling, May 202518 months for new construction or operationExecutive-order target, not an observed mean
UK Rolls-Royce SMRPreferred bidder 10 June 2025 (GOV.UK)Procurement, not a licensed reactor

Source: U.S. NRC; U.S. Department of Energy; GOV.UK (10 June 2025).

03 Legal leadership companies hire here

Legal leadership companies hire here.

01

Project general counsel, nuclear new-build

The person who holds NRC or ONR licensing, construction contracts and offtake in one seat while the vendor, the utility and the host state still disagree on who owns the risk. Often the first legal hire at an SMR developer.

First general counsel search
02

SMR licensing counsel (NRC / ONR)

Part 50 / Part 52 / prospective Part 53 in the United States; Generic Design Assessment in the United Kingdom. Kairos Hermes took 27 months from acceptance to construction permit; TerraPower Kemmerer took 22. The ceiling is 18. That arithmetic is the brief.

In-house counsel recruiting
03

Offtake and power-purchase counsel

The offtake that makes a small modular reactor financeable. Adjacent to storage and hydrogen contracting, different liability and nuclear-damage conventions. Lives next to the energy-transition desk, not inside it.

In-house counsel recruiting
04

PE portfolio company GC

Sponsor-backed developers and component suppliers need an operating GC who can report a licensing clock to a hold-period committee. Distinct from the manager-level PE seat. See legal hiring for PE-backed companies.

PE portfolio legal recruiting
05

Deputy GC, projects

Second chair once a developer holds more than one docket. Construction claims, export-controlled components and the host-state file. Of 47 deputy and Head of Legal placements since 2017.

Deputy GC search
06

Chief compliance officer

Nuclear-safety culture, export controls on components, and sanctions where fuel or technology crosses a border. Audit-committee line. Run as a CCO search, not as a policy add-on to the GC.

Chief compliance officer search

Export-controlled components and fuel-cycle work often pull in sanctions, MLRO and export-controls search. Interim cover for a docket surge is interim legal talent.

04 A closed search

What the energy book actually looks like.

Energy · Tadawul-listed / cross-border · Riyadh with London and Houston coverage

Cross-border Head of Legal

Situation
The company needed sanctions and projects counsel who had actually run a desk, including people not already in the Kingdom.
Approach
Mapped sitting in-house projects counsel across London and Houston against a confidentiality protocol; sitting GC was not shopped.
Outcome
Closed week 10. Second mandate for the same client.

Timeline: Accepted offer week 10 (of 230+ in-house placements since 2017).

Head of talent, Tadawul-listed energy company, Riyadh: "Most firms sent regional CVs. They mapped who had actually built a sanctions desk, including people not in the Kingdom. The search closed in ten weeks."

Hiring nuclear and SMR counsel — questions from CEOs and GCs

Who should a company hire first on an SMR project — a GC or licensing counsel?

A project general counsel who has sat inside an NRC or ONR docket, then licensing counsel as the second chair. A copied utility-GC description misses the vendor and host-state files. Start with first general counsel search or in-house counsel recruiting.

Is nuclear legal hiring the same as renewables project counsel?

No. Nuclear-damage conventions, export-controlled components and a multi-year licensing clock are a different statute. The renewables and energy-transition micros remain the right pages for storage and hydrogen.

Do PE-backed SMR developers need a different search?

Yes. The sponsor wants an operating GC who can report a licensing clock against a hold period. That is legal hiring for PE portfolio companies, not a law-firm nuclear partner search. PE-backed GC clock: 26 days to shortlist, 12 weeks to accepted offer.

Where do you run nuclear and SMR searches?

Houston, London, Washington and, for host-state work, the Gulf. City pages: Houston, London and Washington. The market note is nuclear and SMR project lawyers.

How long does a retained nuclear-project GC search take?

GC and CLO shortlist in 24 days; accepted offer in 11 weeks median, range 8 to 16, of 38 GC and CLO searches since 2017. Cross-border energy seats run longer: 28 days to shortlist, 14 weeks to offer.

How confidential is a nuclear search when the docket is public?

The docket is public; the hiring hand is not. We keep candidacy blind both ways until mutual interest is confirmed. Conflicts are checked before outreach. See methodology.

Start a conversation

Staff the docket before the preferred-bidder press release.

Retained for GC, CLO and CCO searches. Fixed fee, three instalments, 12-month replacement. We map against licensing history and offtake geography — not against a nuclear-industry mailing list.